Please use this identifier to cite or link to this item: https://hdl.handle.net/11017/2852

Improved dredge material management for the Great Barrier Reef Region: Synthesis report


View this entry

Title: Improved dredge material management for the Great Barrier Reef Region: Synthesis report
Authors: Sinclair Knight Merz Pty Ltd
Asia-Pacific Applied Science Associates
ASFA Subjects: Dredging
Location: Reef-wide
Category: Coastal development
Water quality
Issue Date: 2013
Publisher: Great Barrier Reef Marine Park Authority
Abstract: The Department of Sustainability, Environment, Water, Population and Communities and the Great Barrier Reef Marine Park Authority commissioned Sinclair Knight Merz Pty Ltd and Asia-Pacific Applied Science Associates to undertake a study on Improved Dredge Material Management for the Great Barrier Reef Region. The study provides analysis and information to inform future dredge material management for the five major ports (Ports of Cairns, Townsville, Gladstone, Abbot Point, Hay Point) and one marina (Rosslyn Bay) in the Great Barrier Reef World Heritage Area. The study examines differences in sediment migration patterns from placing dredge material at hypothetical alternative and currently used placement sites. It is the first study to both incorporate the effects of regional oceanic currents in modelling dredge material migration and model dredge material migration over a period of 12 months, providing insight into the behaviour and potential risks of dredge material over time. The information generated by this study is high level and is not intended to replace the detail required as part of an environmental impact assessment process for any future dredge material placement operations.
URI: http://hdl.handle.net/11017/2852
Type of document: Report
Appears in Collections:Effects

Files in This Item:
File Description SizeFormat  
gbr-dredge-material-management.pdfSynthesis report2.41 MBAdobe PDFThumbnail
View/Open
gbr-dredge-material-management.docxSynthesis report (accessibility compliant)5.12 MBMicrosoft Word XMLView/Open
gbr-dredge-material-management-appendixa.pdfAppendix A: Literature review and cost analysis1.83 MBAdobe PDFThumbnail
View/Open
gbr-dredge-material-management-appendixa.docxAppendix A (accessibility compliant)1.68 MBMicrosoft Word XMLView/Open
gbr-dredge-material-management-appendixb.pdfAppendix B: Water quality review and monitoring1.23 MBAdobe PDFThumbnail
View/Open
gbr-dredge-material-management-appendixb.docxAppendix B (accessibility compliant)1.21 MBMicrosoft Word XMLView/Open
gbr-dredge-material-management-appendixc.pdfAppendix C: Bed shear-stress modelling9.71 MBAdobe PDFThumbnail
View/Open
gbr-dredge-material-management-appendixc.docxAppendix C (accessibility compliant)37.07 MBMicrosoft Word XMLView/Open
gbr-dredge-material-management-appendixd.pdfAppendix D: Identification of alternative sites11.63 MBAdobe PDFThumbnail
View/Open
gbr-dredge-material-management-appendixd.docxAppendix D (accessibility compliant)12.8 MBMicrosoft Word XMLView/Open
gbr-dredge-material-management-appendixe.pdfAppendix E: Sediment plume and migration modelling26.46 MBAdobe PDFThumbnail
View/Open
gbr-dredge-material-management-appendixe.docxAppendix E (accessibility compliant)48.16 MBMicrosoft Word XMLView/Open
gbr-dredge-material-management-appendixf.pdfAppendix F: Sensitive receptors risk assessment24.98 MBAdobe PDFThumbnail
View/Open
gbr-dredge-material-management-appendixf.docxAppendix F (accessibility compliant)49.3 MBMicrosoft Word XMLView/Open


Items in the ELibrary are protected by copyright, with all rights reserved, unless otherwise indicated.

Google Media

Google ScholarTM

Who's citing