Please use this identifier to cite or link to this item:
https://hdl.handle.net/11017/479
Heron Island spoil dump
View this entry
Title: | Heron Island spoil dump |
Authors: | Gourlay, M.R. Jell, J.S. |
ASFA Subjects: | Water quality Development plans Coastal planning Dredge spoil |
APAIS Subject: | Environmental management Environmental impact studies |
Category: | Coastal development Water quality |
Issue Date: | 1993 |
Publisher: | Great Barrier Reef Marine Park Authority |
Series/Report no.: | Research publication series no. 28 Research publication |
Abstract: | The Heron Island harbour was re-dredged between September and November 1987 and a swing basin for vessels and a jetty were also constructed at that time. Following concern about the potential effects of the dredging operation, a multi-disciplinary monitoring program was initiated. This report covered the investigation into the nature and distribution of sediments on the reef flat and in the spoil dump, the conditions responsible for the erosion of the spoil dump and the quantity of dredge material in the spoil dump. |
URI: | http://hdl.handle.net/11017/479 |
ISBN: | 9780642174345 |
Type of document: | Report |
Appears in Collections: | Effects |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
Heron-Island-spoil-dump.pdf | PDF version | 35.25 MB | Adobe PDF | View/Open |
Items in the ELibrary are protected by copyright, with all rights reserved, unless otherwise indicated.