This report provides a summary of the fieldwork conducted as a part of BMT's second baseline survey in autumn 2020. Two trips were conducted during the Autumn 2020 campaign; the first trip comprised entirely of vessel based sampling, while all in-water (diving) work and the remainder of the surface work was conducted on the second trip.
Description
Prepared by BMT Pty Ltd for the Great Barrier Reef Marine Park Authority. Reference: R.B23282.009.00.Preliminary Report Baseline Survey 2.docx
Keywords
Alternative title
Citation
Part of Series
Douglas Shoal Remediation Project
Report to the Great Barrier Reef Marine Park Authority