GBRMPA

Publication:
Douglas Shoal Remediation Project: environmental monitoring: baseline survey 2 – preliminary fieldwork report

Loading...
Thumbnail Image

Date

Journal Title

Journal ISSN

Volume Title

Publisher

Great Barrier Reef Marine Park Authority

Research Projects

Organizational Units

Journal Issue

Abstract

This report provides a summary of the fieldwork conducted as a part of BMT's second baseline survey in autumn 2020. Two trips were conducted during the Autumn 2020 campaign; the first trip comprised entirely of vessel based sampling, while all in-water (diving) work and the remainder of the surface work was conducted on the second trip.

Description

Prepared by BMT Pty Ltd for the Great Barrier Reef Marine Park Authority. Reference: R.B23282.009.00.Preliminary Report Baseline Survey 2.docx

Keywords

Alternative title

Citation

Part of Series

Douglas Shoal Remediation Project
Report to the Great Barrier Reef Marine Park Authority

Collections

Endorsement

Review

Supplemented By

Referenced By