The Heron Island harbour was re-dredged between September and November 1987 and a swing
basin for vessels and a jetty were also constructed at that time. Following concern about the
potential effects of the dredging operation, a multi-disciplinary monitoring program was initiated.
This report covered the investigation into the nature and distribution of sediments on the reef flat
and in the spoil dump, the conditions responsible for the erosion of the spoil dump and the
quantity of dredge material in the spoil dump.